3mm Society, Railway

Martins Road – First track

Commenced track laying on Martins Road tonight. The trackplan has been transferred onto the foam board sub base and the 2 points stuck down using PVA with a few bottles of real ale to hold them down. So now wait for the PVA to dry and see the result. BTW the foam board tracklaying method I picked up from Chris Nevard (Model Rail 161) which featured his Brewhouse Quay layout.

image

image

image

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.